A typical wet room installation costs around £5,500 in 2026, with most jobs falling in a range of £4,000 to £7,000. Converting a standard bathroom usually takes between four and seven days. The final price depends heavily on the size of the room, the extent of the waterproofing required, and any changes needed to the floor or drainage.
What a wet room is and who it suits
A wet room is a completely waterproofed bathroom where the shower area sits entirely flush with the rest of the floor. There is no step up into a traditional shower tray, and usually no bulky glass enclosure to navigate. The water simply drains away through a gentle slope built directly into the floor structure.
This creates a space that feels open, modern, and far less cramped than a standard bathroom setup. It is especially suited to people with mobility issues because it offers true level access, removing the trip hazards associated with standard shower trays. You can simply walk or wheel into the shower space without obstruction.
Wet rooms also suit small bathrooms where a traditional bath or large shower cubicle would take up too much valuable space. A wet room is built so that the walls and floor are sealed against moisture, which is why waterproofing matters so much.
The installation process is more involved than a simple bathroom swap. It requires careful planning, skilled tradespeople, and a thorough understanding of how water flows. If you are trying to understand whether to replace a tired bathroom with a wet room, you need to know exactly what the job involves and where your money goes.
What a wet room typically costs
The overall cost of fitting a wet room varies widely depending on the condition of your existing bathroom and the quality of the finish you choose. A typical installation costs around £5,500, but a straightforward job can cost as little as £4,000. At the other end of the scale, a large or complex project can easily reach £7,000 or more.
The size figures below are for converting an existing bathroom in reasonable condition, so hidden water damage or structural problems would add to the cost.
A wet room project brings together several different trades. You will usually need a plumber or heating engineer to handle the water supply and waste pipes, a specialist to install the waterproofing, a tiler to finish the surfaces, and a registered electrician for any wiring.
Regional variations also play a significant part in the final bill. Prices vary by region. In London, tradespeople's day rates are higher, at £250 to £350.
Cost by size
The size of your bathroom is one of the biggest factors in determining the cost of a wet room. A larger room requires more waterproofing materials, more flooring, and more time to prepare and tile.
The figures below show the cost by size for a property in the Midlands, assuming the conversion of an existing bathroom that is in reasonable condition.
|
Wet room size |
Dimensions |
Typical installation cost |
|---|---|---|
|
Small |
Around 2m x 2m |
£4,700 |
|
Standard family |
2m x 2.5m to 3m |
£5,900 |
|
Large or luxury |
Over 3m x 2.5m |
£8,350 |
These are typical 2026 prices, so local quotes will differ, and the quote should say whether VAT, tiling and tanking are included.
A larger room needs more waterproofing, flooring and time, which is why the cost rises with size. If you are comparing these figures to a standard refit, reading about the new bathroom installation cost will help you weigh up the difference between a traditional suite and a fully waterproofed room.
Labour and how long it takes
Labour usually makes up 30 to 40 per cent of the total project cost. The average UK day rate for a tradesperson is £180 to £250. In London, this average day rate rises to £250 to £350. A wet room requires multiple skills to ensure the room is completely watertight and safe.
The type of wet room you want will dictate the total labour cost and how long the tradespeople need to work in your home.
|
Wet room type |
Typical labour cost |
Typical duration |
|---|---|---|
|
Small basic |
£1,300 to £1,800 |
3 to 5 days |
|
Standard mid range |
£1,700 to £2,500 |
4 to 7 days |
|
Large high spec |
£2,400 to £3,200 |
6 to 8 days |
|
Luxury or complex |
£3,000 to £5,000+ |
7 to 10 days |
These are typical 2026 prices, so local quotes will differ.
The work happens in several stages. First, the plumber will isolate the water supply at the stop tap and strip out the old fixtures. Then comes the first fix plumbing, where the new hot and cold supply pipes and the waste pipes are run to their new positions.
After this, the floor is prepared, the waterproofing is applied, and time is left for it to dry. The tiling is then completed, followed by the second fix, where the shower, toilet, and basin are connected and tested. A small, basic job can be turned around in just three to five days, while a luxury installation can easily take over a week.
If you are converting a room to make it accessible, you might wonder about changing it back in the future. Converting a wet room back to a regular bathroom takes about seven to ten days and costs around £6,600 on average.
Waterproofing, drainage and the floor
The most critical part of a wet room is the waterproofing, which the trade calls tanking. A wet room should always be tanked. You cannot rely on the surface finishes alone, because tiles, adhesive and grout are not waterproof alone. If water gets behind them, it can damage your walls and can leak through the ceiling below.
Tanking involves applying a waterproof liquid membrane or heavy-duty waterproof boarding to the walls and floor, creating a completely sealed space. Only once this layer is secure and dry can the tiling begin.
Creating the level floor and the slope for the water to drain away is the part of the job that often adds complexity and cost. The plumber or fitter will usually install a shower tray former. This is a pre-formed, sloped board that sits beneath the floor covering to guide the shower water perfectly toward the drain.
Fitting this former often requires alterations to the floor. The tradesperson may need to cut into the floorboards or adjust the timber joists to ensure the former sits flush with the rest of the room. Labour for floor repairs or strengthening is typically £250 to £800.
The waste pipes must also be set at the correct angle beneath the floor to carry the water away efficiently. If your existing pipes are in the wrong place or the wrong size, the plumber will have to reroute them. Labour for drainage or waste pipe alterations is typically £200 to £700. If your current setup is already causing problems, you might be weighing up a leaking shower tray repair against upgrading to a full wet room.
Materials and extras
The materials you choose for the hidden plumbing components and the final finish will move your quote up or down. You should understand what these items cost, and ask whether they are included in the quote.
Here are the typical prices for the materials and extra tasks involved in building a wet room.
- Shower tray former costs £450 to £550
- Full room tanking costs £300 to £800
- Tanking shower kit costs £130 to £180
- Wet room drain or waste kit costs £50 to £130
- Electric underfloor heating materials cost £300 to £400
- Electric underfloor heating labour costs £200 to £500
- Lighting, extractor fan or electrical alterations cost £150 to £500
- Skip hire costs £60 to £130
A tanking shower kit and full room tanking are priced separately, so ask the tradesperson which they are pricing and who will do the work.
The flooring material is priced per square metre and has a huge impact on the final budget. Tiled flooring costs £30 to £50 per square metre. Vinyl is a budget-friendly option that costs £20 to £40 per square metre. Microcement provides a seamless, modern finish but is much more expensive at £80 to £120 per square metre.
If you are keeping the rest of the room simple, you might also look at the mixer shower installation cost to see how the shower valve and head affect your overall budget.
Rules, planning and electrics
You rarely need planning permission to install a wet room in your home. The Planning Portal states that a planning application is generally not required unless the wet room is part of a house extension. If you live in a listed building, the rules are stricter, and you must consult your local planning authority to get listed building consent before any work begins.
Building Regulations are a separate set of rules that ensure homes are safe, well-ventilated, and structurally sound. These regulations may apply to your wet room conversion if the work involves structural changes, drainage alterations, new ventilation, or electrical changes. Ask your tradesperson or local council whether your job needs approval.
Electrical safety is absolutely vital in a wet room. Water and electricity are a dangerous combination. Any electrical work, such as installing an electric shower, an extractor fan, lighting, or electric underfloor heating, should be certified by a registered electrician.
Ask the electrician for the certificate once the job is complete and keep it safely with your household records.
Accessible wet rooms and the Disabled Facilities Grant
A wet room can be a practical choice for a disabled person or someone with limited mobility. A small disabled access wet room typically costs around £4,950 for a standard conversion. However, if the job requires structural work, specialist mobility fixtures, or major plumbing relocation, this will raise the price.
You could get a Disabled Facilities Grant from your local council to help cover these costs. To be eligible, you or another person living in the home must be disabled. The applicant must be the owner of the property, a tenant, or a landlord.
The grant is designed to pay for changes that improve access to rooms and facilities, such as installing a level access shower. The amount you will get depends on where you live in the UK.
- In England, you can get up to £30,000
- In Wales, you can get up to £36,000
- In Northern Ireland, you can get up to £25,000
Disabled Facilities Grants are not available in Scotland. Depending on your income, you may need to contribute toward the total cost of the work. Some councils may give more than the listed maximums.
You must apply for the grant through your local council and wait for their official approval. Starting work before the council approves your application may mean no grant is paid. You should also remember that planning permission and Building Regulations approval are separate processes, and you must apply for them separately if your project requires them.
What to ask before you agree a quote
When you are ready to hire a tradesperson, always insist on a written quote. A quote is a fixed price that the tradesperson commits to, whereas an estimate is just a rough guess that can easily increase as the job progresses.
A proper written quote should break down the costs so you know exactly what is included. Because a wet room involves hidden structural and drainage work, you need to be certain that the price covers everything required to make the room safe and watertight.
Ask the tradesperson these questions before you agree to the quote.
- Does the final price include all materials, labour and VAT
- Who will be doing the tanking and what guarantee comes with it
- Are floor repairs and waste pipe alterations included in the price
- Will you arrange the skip hire and dispose of the old bathroom waste
- Is an electrician registered to sign off the electrical work included
- How many days will the water supply be turned off while you work
- Does the quote include the final floor finish and tiling
Keep all paperwork, invoices, and electrical safety certificates once the job is finished. You will need these if you ever need to claim on a warranty or if you decide to sell your home in the future.
Common questions
Why are wet rooms more expensive than normal bathrooms?
Wet rooms cost more because the entire space must be professionally waterproofed with a tanking kit, which requires specialist materials and extra labour. The floor often needs to be altered or strengthened to create a gentle slope for the water to drain away safely, and waste pipes may need to be rerouted beneath the floorboards.
Can you put a wet room upstairs?
You can put a wet room upstairs, provided the timber floor is strong enough and the space is tanked correctly. The tradesperson will need to check the floor joists to ensure they can support the waterproof boarding, the shower tray former, and the weight of the tiles.
Do I need an extractor fan in a wet room?
A wet room creates a large amount of steam, so good ventilation is essential to stop damp and mould from ruining the finish. Building Regulations may apply if the work involves ventilation changes, so ask your tradesperson or local council what is needed.
Is underfloor heating necessary in a wet room?
Underfloor heating is not legally required. It is an extra, and it adds to the cost.
Next steps
Before you hire someone to fit your wet room, take the time to plan the project carefully and gather detailed prices.
- Decide on the size of the wet area and the type of flooring you want
- Check if you are eligible for a Disabled Facilities Grant before you start any work
- Ask three different tradespeople for a written, fixed price quote
- Check that each quote clearly includes tanking, floor alterations and waste disposal
- Ask to see the tradesperson's previous wet room work or customer reviews
Getting the waterproofing and drainage right is the most important part of the job to prevent water damage. Take your time to compare quotes, ask the right questions, and find a plumber near you who has the right experience to deliver a safe and lasting finish.
Find a top rated plumber near you
4,869 plumbers across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county: