What Is a G3 Unvented Qualification and Why Does It Matter?

What requirement G3 in Approved Document G says about unvented hot water cylinders, how installers show their skills, when building control must be told, and the certificate an owner should receive.

Illustration of a hot water cylinder in a cupboard with a blank certificate and card

Approved Document G says the installation of an unvented hot water system is notifiable building work. It also says building owners and occupiers should take care to choose installers who have the necessary skills. These skills can be demonstrated, for example, by being registered with a competent person scheme for unvented work, or by holding a current registered operative skills certification card for unvented hot water systems. Approved Document G is practical guidance and not itself the law.

What an unvented system is and why it is treated differently

An unvented system has a hot water storage vessel. Approved Document G's guidance on requirement G3(3) says an unvented storage vessel has at least two independent safety devices, in addition to any thermostat. Such devices are the kind that release pressure and so prevent the temperature of the stored water at any time exceeding 100°C.

Paragraph 3.40 says the safety and performance of an unvented system depends on the choice of system and safety devices appropriate for the location and on correct installation.

Paragraph 3.26 says systems over 500 litres capacity will generally be bespoke designs for specific projects. In that case the unvented system should be designed to the safety requirements in 3.17 by an appropriately qualified engineer.

What requirement G3 says

Requirement G3 is one of the requirements in Part G of Schedule 1 to the Building Regulations 2010. The introduction to Approved Document G says the document has been approved and issued by the Secretary of State to give practical guidance on complying with Requirements G1 to G6 and regulations 7 and 36 of the Building Regulations 2010 (SI 2010/2214), as amended. It took effect on 1 March 2016 for use in England.

Following this guidance gives a presumption of compliance, which is not conclusive. People carrying out building work should check with their Building Control Body, which is the local authority or an Approved Inspector. The official government page lists an 'Updated Approved Document G incorporating 2024 amendments', added on 1 October 2024, with amendments first added on 15 May 2024.

Requirement G3(2) says that a hot water system, including any cistern or vessel that supplies water to or receives expansion water from it, shall be designed, constructed and installed so as to resist the effects of temperature and pressure that may occur in normal use or in such malfunctions as may reasonably be anticipated, and must be adequately supported.

Requirement G3(3) focuses on heat and discharge. It states that a hot water system with a hot water storage vessel shall incorporate precautions to prevent the stored water temperature at any time exceeding 100°C. Furthermore, it must ensure that any discharge from safety devices is safely conveyed to where it is visible but will not cause a danger to persons in or about the building.

Who should install an unvented system

The term 'G3' refers to a requirement in the Building Regulations 2010 and nothing else. It is not the name of a certification card or a training course, and the Approved Document text does not use the phrase 'G3 certificate'.

Paragraph 3.40 gives two examples of how an installer's skills can be demonstrated. One is registration with a competent person scheme for this type of work.

The other example is the holding of a current registered operative skills certification card for unvented hot water systems. The Approved Document names no register or website for checking either one.

Is the work notifiable

In almost all cases of new building work, a Building Control Body must be notified in advance. Approved Document G paragraph 3.41 states clearly that the installation of an unvented system is notifiable building work which must be notified to the Building Control Body before work commences. Once notified, the Building Control Body may then check the work is safe and meets current energy efficiency requirements.

There are two exceptions to this advance notification rule.

The first exception is for work carried out under a self-certification scheme listed in Schedule 3 of the Building Regulations. Paragraph 3.42 explains that if the installer is registered with a competent person scheme for installing unvented hot water systems, it will not be necessary for the work to be notified in advance to the Building Control Body. Such installers self-certify that the work complies with all relevant Building Regulations requirements.

The second exception applies to small-scale work listed in Schedule 4 to the Building Regulations as not notifiable. This Schedule 4 non-notifiable work includes providing a hot water storage system with a storage vessel capacity not exceeding 15 litres. This exemption only applies provided any associated electrical work is also not notifiable.

The certificate you should receive afterwards

Under paragraph 3.42, the building owner or occupier of a home where a registered installer has worked will be given a building regulations certificate of compliance. The certificate is usually issued by the scheme operator.

Approved Document G sets out the timing. Where work is done by a person registered with a competent person scheme, the occupier must be given, within 30 days of completion, a certificate confirming the work complies with all applicable Building Regulations requirements. The Building Control Body must be given a notice that this has been done, or a copy of the certificate, within 30 days of completion. These are usually made available through the scheme operator.

Paragraph 3.79 says that where installation of fixed building services requiring commissioning is carried out by a person registered with a competent person scheme, the notice of commissioning will be given by that person. Paragraph 3.78 says that in such cases it must be given not more than 30 days after the completion of work. Where the work is done under a building notice or full plans, the notice of commissioning should be given not more than 5 days after completion of commissioning.

While self-certification speeds up the process, local authority inspection and enforcement powers remain. These powers are normally used only in response to a complaint that work does not comply with the regulations.

How to check an installer

Because no register or website is named for checking an installer's unvented credentials, the questions below are the way to check. They follow paragraphs 3.40 to 3.42.

  1. Ask whether the installer is registered with a competent person scheme for unvented systems or holds a current registered operative skills certification card.
  2. If they hold a card, ask whether it is current and whether it covers unvented hot water systems.
  3. Ask who will notify building control or issue the building regulations certificate once the cylinder is fitted.
  4. After the job, confirm that you have received the building regulations certificate, which should reach the occupier within 30 days of completion.

What this proves and what it does not

Costs are covered in our hot water cylinder replacement cost guide. The table sets out what a competent person scheme registration or a skills card of that kind shows, and what it does not.

What this proves

What it does not prove

Skills for unvented hot water system work, shown by registration or a current card

General plumbing competence

A registered installer self-certifies that the work complies with the Building Regulations

That the price is fair

A registered installer does not need to notify the Building Control Body in advance

The quality or neatness of the finished work

The choice between boiler types is covered in our guide to a combi, system or regular boiler.

Common questions

Is Approved Document G a law?

No. It is practical guidance issued with the Secretary of State's approval. Following it gives a presumption of compliance with the Building Regulations, which the document itself says is not conclusive, so the Building Control Body is the place to check.

What is a Building Control Body?

Approved Document G uses the term for the local authority or an Approved Inspector. It is the body that must be notified of notifiable work, either in advance or, where the installer is registered with a competent person scheme, through the notice or certificate sent within 30 days of completion.

What if the installer is not registered with a competent person scheme?

Then the usual rule for notifiable work applies, and the Building Control Body is told before the job begins. Afterwards it may inspect the job for safety and for energy efficiency against current requirements.

Who sends the notice or certificate to the Building Control Body?

Approved Document G says the notice, or a copy of the certificate, is usually made available through the scheme operator. For a registered installer, the scheme is therefore the place to ask where the paperwork stands.

Is a very small hot water store notifiable?

Schedule 4 lists the provision of a hot water storage system with a vessel of no more than 15 litres as not notifiable, as long as any associated electrical work is not notifiable either. Work that falls under neither exception is notifiable in advance.

Can the council still look at self-certified work?

Yes. The council keeps its powers to inspect and enforce, though it normally uses them only after a complaint that the work breaks the rules.

Will a small water heater satisfy the requirements?

Paragraph 3.19 says water heaters with a capacity of 15 litres or less that have appropriate safety devices for temperature and pressure will generally satisfy the requirement set out in G3(3).

What standards should an unvented cylinder meet?

Paragraph 3.22 says any unvented hot water storage system up to 500 litres and less than 45kW should be in the form of a proprietary hot water storage system unit or package. It should satisfy an appropriate standard ensuring G3(2) and G3(3) are met, for example BS EN 12897:2006 or BS 6700:2006 + A1:2009.

Why is there a warning label on my water heater?

Paragraph 3.24 says a warning should be indelibly marked on the unit so that it is visible after installation. It tells the user not to remove or adjust any component of the unvented water heater and to switch it off and contact the installer if it develops a fault. The installer warning says 'This installation is subject to the Building Regulations.'

What is the bath temperature limit?

Paragraph 3.65 says the hot water supply temperature to a bath should be limited to a maximum of 48°C, by an in-line blending valve or other appropriate temperature control device with a maximum temperature stop.

Next steps for your unvented cylinder installation

Before you allow anyone to install, repair or replace an unvented hot water cylinder in your home, ensure you have verified their skills and understood the paperwork process.

  • Ask the installer which of the two examples in paragraph 3.40 applies to them.
  • Ask who will handle the notification to the Building Control Body before work begins.
  • After the job, check that the building regulations certificate of compliance has reached the occupier, which should be within 30 days of completion.

When you are ready to move forward, you can find a plumber near you and ask the questions above.

Find a top rated plumber near you

4,869 plumbers across the UK, each ranked on their Google rating and the number of reviews behind it. Start with your county:

All counties and towns · The UK Top 100 plumbers

Kerry Evans
Written by
Kerry Evans Writer

Kerry researches and writes guides for Top Rated Plumbers, turning prices, rules and official guidance into plain advice for homeowners. She is slowly working through every Agatha Christie novel.